Hi Rupesh,
Thanks for reply. Yes, you are correct we can achieve desired functionality by activating inspection at '105' movement.
But our business process is;
When material comes from Vendor, we are preparing MRN with '103' movement and inspection lot generated. During Quality inspection;
* if lot rejected then whole lot is returned to the vendor through mvt. '124' without doing mvt. '105'.
* if lot accepted then through mvt. '105' release from GR block stock.
As our Quality inspection done at mvt. '103' level, we want to introduce restriction / validation for checking whether QM result / UD given or not at the time of doing movement '105'.
Whether it is achieved through configuration or we have to implement User-Exit (QAAT002).
Thanks in advance,
Regards,
Shailesh