Hi Experts,
I have a scenario as below:
Steel rods are raw material received from vendor with Heat number.
Keep it in stock as batches in base UOM Inch. I have stock 5.000 inch rod (Batch 1) and 10.125 inch rod (Batch 2).
I have maintained Variable size "R" unit in BOM as 1PC = 5.375inch. Created a Production order with requirement of 5.375 inch rod. While determining the batch system proposes Batch1 5.000 inch and 0.375in from Batch 2. I want the system to propose Batch 2 only not the Batch1 at all.
Can any one suggest me how to meet this requirement. Is there any User exits, Routines etc.?
How the Object dependency coding will be useful to meet his requirement.?
I hope definitely you could have got this requirements. Can you give me some idea?
Regards,
Ramakrishnan.A