When we create a sales order for configurable material with strategy 25 without referencing a quotation, requirement is shown in MD04 List. But same sales order if created by referring an existing quotation is not displayed in MD04
Material master settings
Strategy:25
Availability check: 02
MRP Type : PD
Settings for quotation
Requirement type in quotation: KEK
Item Category: AGC
Shchedule line category:BP
Requirement/ Assly : Checked in vov6
Availability: checked in VOV6
Settings for Sales order
Requirement type in Sales order: KEK
Item category: TAC
Schedule line category: CP
Requirement/ Assly : Checked in vov6
Availability: checked in VOV6
We have checked and run SDRQCRR21 program to correct errors if any in database tables. But problem is not solved