Hallo Dev,
yes, we knew the authorization group for material master data. But we want to build up to create material master date by two steps:
1. one unit should be able to maintain material master data with status blocked.
2. an other unit is going to check the master data. If the master data is alright, only this unit can unblock the master data.
This should be realised with the field x-plant matl. status.
Kind regards
Sven.