Dear gurus:
I am having an issue on phase 24of 31 to complete the SAP IDES ERP EHP 7 for ABAP installation.
I recive this message
An error occurred while processing option SAP Business Suite 7i 2013 Support Release 1 > EHP7 for
SAP ERP 6.0 ABAP Support Release 1 > MS SQL Server > SAP Systems > Application Server ABAP
> Standard System > Standard System( Last error reported by the step: Instance ECC/DVEBMGS00 reached
state SHUTDOWN after having state STARTING. Giving up.).
My configuration is
Memory: 24GB RAM
HDD: 1TB
Virtual Memory: 25 GB
Processor Core i7 3.40 Ghz
Operating System WINDOWS SERVER 2008 R2 (all patches applied(
Database Engine SQL SERVER 2008 SP1 applied
I consider I have enough resources to install this but I think I am missing something related to memory.
If I open the SAPMMC and check for red flags, at memory it say 129 Pg/S
Could you please help me?
Kind Regards
Jose