Quantcast
Channel: SCN: Message List - Enterprise Resource Planning (SAP ERP)
Viewing all articles
Browse latest Browse all 6103

Client Roles in a Three System Landscape

$
0
0

Hi all,

 

We have a three system landscape. In the Development client, we have the Customizing Client, the Sandbox Cliet and a Training client. I have some questions about this configuration:

 

Acording to System and Client Settings - System Administration Assistant (BC-RRR) - SAP Library, Training client must be in Quality Assurance System, and it must be created by client copy from client QTST (it gets the transports from Custimizing). In this Training System we must create users for all our key-users to training. We must not create any user for key-users in sandbox client (this client is for the DEV team). is that ok?

 

What are the downsides of having out TRAINING client in the Development System?

 

Now, a consultant is asking me to open some modifications in the TRAINING client: He needs to load Exchange rates (OB08) in that client, but he is getting "Client is not modifiable". They are asking me to create users for key-users in the sandbox client and the training client.

 

I need to know if they are using the system in the right way. I dont want the system to become a mess.

 

I been reading this notes: SAP Note 356483. I don´t know what this means: "Now the corresponding Customizing object is no longer subject to the transport connection and is excluded from the changeability check. The change is active in all clients of the system. You can also change the Customizing object in a locked client (independent of the client role). However, now it is also no longer possible to manually transport entries of the view or table."

 

Aditional notes:

SAP Note 78329,  sap kb 356483

 

 

Thanks for your help!


Viewing all articles
Browse latest Browse all 6103

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>