Dear All,
What is the right approach of Release Strategy in Purchase Requisition in standard .
We have activated , (Set Up Procedure Without Classification) .
We determine in the basis of material group
Now management’s requirement is we make it two tire release code.
Between value 1000 one approver.(Release point)
And above 1000 another approver (Release point).
Is it possible through Set Up Procedure Without Classification ? How?
1=because , as per my understanding the Without Classification used for line level
Not for header level in purchase requisition .
How the configuration for two step?
With in 1000 value for one approver
And above 1000 value another approver.
Just go through the attachments?
My Approach is,
1=release code desc..
01 PR-HT
02 PR-HT
2=
Release ID Desc
2 RFQ/Purchase requisition
3=
Release Strategy C1 C2 C3 C4 C5 C6 C7 C8 Rel.ID Desc
S1 X Blocked
S1 X 2 RFQ/PR
S2 x Blocked
S2 + X 2 RFQ/PR
4=
Rel. Str Release Code Desc C1 C2 C3 C4 C5 C6 C7 C8
S1 01 PR X
S2 02 PR X2
5=
Acc.Assig Mat Grp. Plant Value of PR crcy Release Strategy
C-BELT 1100 1 INR S1
-BELT 1100 1000 INR S2
Please Guide?